opschain changes show

Included from Basic tier

opschain changes show <id|code> [--limit <n>] [--owner /|/projects/<code>] [--story-kinds <kind>,...]

Shows the record and its story: every run under it oldest first with its status and how it joined (explicit, scope, inherited, linked), its break-glass records, and the events of its runs, their steps and the record's own ledger in order. Runs you cannot read are counted as withheld, never named. -o json prints the same story as one document; opschain changes export writes the whole story when it is longer than --limit entries.

--story-kinds narrows the entries to the story kinds named — record, approval, link, run, breakglass, attestation (the mapping from event type to kind is in opschain docs resources/change_record) — as a comma list or by repeating the flag; the runs and break-glass records are shown either way, and --limit counts the matching entries. Without it every entry is shown; an unknown kind is a usage error naming the kinds. opschain changes export always writes the complete story.

opschain changes show CHG-2026-004 --story-kinds record,approval,link,breakglass,attestation

A record linked to an ITSM change (a JSM connection's change mapping — opschain docs integrations-jsm) also shows the ITSM line: the system, the change's id and page, its status as last applied, the state the mapping projects it onto and whether the ITSM has approved it; the last inbound move (the ITSM's event id and its own timestamp); and, while work notes have not reached the ITSM, how many are waiting and the warning naming why. The record links to the change; it never retypes the CAB's decision.

ITSM: jsm CHG-12 via itsm — "Scheduled" (approved; approved by the ITSM)
https://limepoint.atlassian.net/browse/CHG-12
Last inbound move: changelog:20077 at 2026-11-19T10:00:00Z

Two more lines appear on a linked record when the ITSM moved it in a way its three states cannot express. Held — the ITSM withdrew an approval the record had: the header shows the state as approved (held) and the line names the reason; no new run joins the record until the ITSM approves it again, and the runs already under it continue. Pending close — the ITSM closed the change while runs under the record were still running: the line names the verdict, the ITSM's status and event, when it arrived and how many runs were running; the record closes with that verdict when the last run under it finishes, and a changes close in the meantime supersedes it. -o json carries both as held and pending_close.

Change record CHG-2026-004 — upgrade the gateway (approved (held))
Held: no new run joins this record — approval withdrawn by jsm (CHG-12 moved to "Awaiting CAB"); runs already under it continue, and the ITSM's renewed approval lifts the hold
Pending close: completed — the ITSM closed the change ("Completed", event changelog:20090) at 2026-11-19T11:00:00Z while 2 run(s) ran; it applies when the last run under the record finishes (a close here supersedes it)

Flags​

FlagMeaning
--limit <n>At most this many story entries (default 100).
--owner <path>The record's owner, / or /projects/<code> — narrows a code two owners hold; ignored for an id.
--story-kinds <kind>,...Only story entries of these kinds: record, approval, link, run, breakglass, attestation (comma list or repeatable; default every entry).

Exit codes​

CodeMeaning
0Shown.
1Not found, or you may not read it.
2Usage error.